Overall view of the logistics hub in Senkivka, Boryspil district

Industrial facilities

Senkivka Logistics Hub

Senkivka · Boryspil district

A logistics hub concept with a Class A warehouse, an administration building, loading docks and truck yards.

The logistics hub is planned for 2d Zavokzalna Street in Senkivka, Boryspil district. The concept includes a single-storey Class A warehouse, a two-storey administration building with a basement, a boiler house, two security posts and a transformer substation. The site layout separates freight and passenger vehicle flows and provides 17 loading docks, a truck holding area and staff parking. Dnipro Alliance prepared the concept and urban planning assessment with key technical and economic parameters. Subsequent design stages were outside the agreed scope.

Dnipro Alliance’s role

  • Architectural concept for the logistics complex
  • Urban planning assessment with key technical and economic parameters
More about integrated design and project support ↗

KEY FIGURES

Based on the urban planning assessment revised on 21 June 2024

2.7627 hasite area
11,752.18 m²total building floor area
10,020.45 m²warehouse floor area
17loading docks
13 548pallet positions
124workplaces

PROJECT FEATURES

01Single-storey Class A warehouse

0217 loading docks, with the warehouse floor 1.200 m above the access road

032,258 six-tier rack bays with a total capacity of 13,548 pallets

04Two-storey administration building with a basement and shelter for 164 people

05Holding area for 23 trucks and 18 passenger car parking spaces

06Separate traffic flows and a comprehensive landscaping plan

Design services for similar projects

Looking for this level of detail?

Discuss your project ↗